Essential Maintenance - Front Porch Replacement – Starting during July/August 2025
The front of the hall facing Station Road is in urgent need of repair. Starting this summer we are planning to replace the old front porch (which is rotten), remove the old projector room, replace the front toilet windows either side of the front doors and repair the flat roof over the toilets. This is an extensive project and will cause some disruption for which we apologise:
- There will be scaffolding up on the front of the hall but the road access round the hall will be open most of the time.
- The front doors will not be accessible.
- There will be a fenced off storage area between the Disabled parking bays and Station Road.
- The toilets at the front of the hall will be accessible from inside the Main Hall most of the time.
The front doors are fire doors but with the other fire doors and emergency exits from the Main Hall we do not have to reduce the hall capacity during the works.
Thank you in advance for your patience.
Refundable Deposit Increase from 23/07/2025
Following experiences with previous private hire bookings we have increased the amount of deposit required. The deposit is fully refundable if the instructions on the hire agreement are followed and the hall is left clean, tidy and locked after the booking. We are in the process of updating the documents downloadable from this website to reflect this.